· 29 Apr 2026
📍 Project Completed This project involved the replacement of a raised decking area that had reached the end of its 20-year lifespan and had become unsafe. The client requested a new installation that would remain visually similar to the original design, with a number of minor alterations to improve both durability and functionality. Our team removed the existing structure and constructed a new area using sandstone face walling stone and Raj blend paving, creating a high-quality, durable finish while maintaining the overall look and layout of the original space. All works were completed on time, despite a late finish, with the client very pleased with the final result. For enquiries, please contact: 📧 [email protected] 📞 01226 500500